+ Reply to Thread
Results 1 to 4 of 4
  1. #1

    Default Success of Scarborough Spa Express

    As the regular season of the Scarborough Spa Express and the Cambrian counterpart draws to a close, I have read that the Scarborough on was a resounding success and the Cambrian one has been struggling for numbers.

    Is it that the Scarborough one is far more accessible to the general public and runs through a larger catchment area?

    Can the Cambrian one not be extended to start at Shrewsbury or at least a connection to and from it provided and advertised. It would be a shame to lose these regular main line running days.

  2. #2
    Shrewsbury Vegtable Rolling Stock Manager
    Join Date
    Jan 2007
    Location
    Shrewsbury
    Posts
    586

    Default

    Real down turn for the CCT was the fact that it was WCRC job, and Arriva didn't want to advertise it. Also they didn't let them use the facilitys at Mach, not even the mess room. Also a run to Aberyswyth was planned, but Arriva weren't having it. Bit immature if you ask me. Next year should be better, more advertisment.

    Dave

    Click my siggy to go straight to my site

  3. #3

    Default

    Just heard that the Black 5 has failed on todays 28th Aug, Scarborough Spa Express, very great shame as this was the last week and the record has been excellent so far.

    Hope that it's not too serious, but if anyone knows whats happened, please tell .

  4. #4
    Shrewsbury Vegtable Rolling Stock Manager
    Join Date
    Jan 2007
    Location
    Shrewsbury
    Posts
    586

    Default

    Blown a piston so I was told.

    Click my siggy to go straight to my site

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts